11" W x 16" L
This collection of documents (2012-2015) includes copies of blueprints of original construction and subsequent planned additions/modification before the 1888 depot was moved in 2016 and includes the following:
Three, hand drawn, in color, depot complex site plans on tissue paper and regular paper. Phase 1-3. Relating to the 1888 Depot relocation and restoration. (1888-2016)