2' W x 3' L
This collection of documents (2012-2015) includes copies of blueprints of original construction and subsequent planned additions/modification before the 1888 depot was moved in 2016 and includes the following:
General Notes; Erosion Control Notes relating to the 1888 depot relocation and restoration in 2016.