2' W x 3' L
This collection of documents (2012-2015) includes copies of blueprints of original construction and subsequent planned additions/modification before the 1888 depot was moved in 2016 and includes the following:
SMSQ Architects, Northfield Depot Relocation and Rehabilitation, SWPPP General Information C3.0. All notes about Stormwater Pollution Preservation Plan prepared by Pierce Pini and Associations.